Rip out and first fix continues.

All the existing dodgy lighting and power pulled out, first fix of new going in. Much tidier and to spec now.




New brick and block work in place for the bi-fold door steels...

External right hand side:


External left hand side:


Internal right hand side:


Internal left hand side:


Our temporary sink and washing machine area, note the lack of dishwasher - the inhumanity!


The old tumble drier vent has vanished!